Steel Work Construction

H-Section Steel Structure

1
3
2
1
3
2

Professional Steelwork Construction & Steel Workshop Solutions | Prefabricated Excellence by Leading Steel Construction Experts

Product Applications​

As a pioneering ​steelwork construction​ company, we specialize in ​steel workshop​ systems and ​steel structure building​ designs tailored to industrial, commercial, and institutional needs. Our ​prefabricated steel buildings​ and ​prefabricated metal building​ solutions leverage modular engineering to deliver fast, durable, and cost-effective structures across diverse sectors:

  • Industrial Production Workshops

    Industrial Production Workshops

    Heavy-duty ​steel metal buildings​ frameworks for machinery halls, assembly lines, and tool storage—engineered to support dynamic loads (e.g., 25-ton overhead cranes) with minimal deflection.

  • Logistics & Warehousing

    Logistics & Warehousing

    Rapid-install ​prefabricated steel buildings​ for distribution centers, cold storage, and e-commerce hubs, featuring clear spans (up to 70m) and tall ceilings (14-20m) to optimize vertical storage capacity.

  • Commercial & Retail Workshops

    Commercial & Retail Workshops

    Open-concept ​steel structure building​ workshops for showrooms, studios, and co-working spaces, combining structural flexibility with customizable cladding (aluminum, corrugated steel) to align with brand identity.

  • ​Agricultural & Rural Workshops

    ​Agricultural & Rural Workshops

    Corrosion-resistant ​building metal​ frameworks for farm equipment repair bays, livestock barns, and crop storage—hot-dip galvanized to withstand animal feed acids, rain, and UV exposure.

  • Institutional Facilities

    Institutional Facilities

    Fire-rated ​steelwork construction​ workshops for schools, hospitals, and labs, meeting strict safety codes (e.g., 2-hour fire resistance) and accessibility standards.

 

From small ​prefabricated metal building​ projects to large-scale ​heavy steel construction​ installations, our ​steel workshop​ systems adapt to your site constraints, workflow demands, and budget.

Manufacturing Process Flow​

​Stage​ ​Process Details​ Key Technologies​
​Design & Engineering​ 3D BIM modeling with Tekla; load analysis (wind, seismic, equipment) via Autodesk Robot. Cloud-based collaboration for real-time client feedback; ergonomic layout optimization.
​​​Material Prep​ Sourcing ASTM A992/A572-65 steel; laser cutting (±0.1mm precision) with CNC machines. Fiber lasers for thin sheets (1-12mm); plasma cutters for thick plates (1-25mm).
Prefabricated Steel Workshop Fabrication​​ Roll-forming steel sections (C/Z purlins, rafters, columns) to custom radii; automated MIG welding for primary/secondary frames. Press brakes (1,200-ton capacity); 5-axis CNC drills for bolt hole alignment (±0.1mm).
​Module Assembly​ Pre-assembled workshop units (walls, roofs, mezzanines) with integrated utilities (electrical, HVAC pre-routing). Laser-guided alignment systems for module connections (±0.05mm tolerance).
​​Surface Treatment​ Prime/paint coatings (250μm thickness) or hot-dip galvanizing (850g/m²); insulation (polyisocyanurate foam) for thermal efficiency. Powder coating lines for color consistency; spray-applied fireproofing (2-hour rating).
​Final Inspection​ Dimensional checks (CMM machines); load testing up to 1.5x design capacity (simulating equipment loads). Third-party SGS audits; RFID tags for material traceability from mill to site.

Welding Quality & Structural Integrity

In ​steelwork construction​ projects, structural stability is critical—especially for heavy machinery support or large-span ​steel structure building. Our welding processes ensure ​prefabricated steel buildings​ meet the highest safety standards:

​Advanced Welding for Workshop Frames​

Primary Frames: For industrial workshops with overhead cranes, we use submerged arc welding (SAW) with ER70S-6 filler metal to achieve full-penetration welds (thickness up to 30mm), eliminating stress points in ​steelwork construction.

Secondary Frames: Lightweight purlins and girts undergo pulsed MIG welding to reduce spatter and distortion—vital for ​prefabricated metal building​ workshops with tight installation tolerances (e.g., equipment alignment).

Critical Joints: Welds at column-to-foundation connections, crane runway supports, and roof trusses receive post-weld heat treatment (PWHT) to relieve stress, followed by galvanizing or epoxy coating to match base metal durability.

 

​Non-Destructive Testing (NDT)​:

X-Ray/UT: For high-load joints (e.g., crane supports), digital radiography (DR) detects 0.08mm cracks; phased-array UT identifies internal flaws in thick sections (up to 400mm).

Visual Checks: AWS-certified inspectors use 15x magnifiers to reject welds with undercutting >0.4mm or porosity >0.8mm.

Dimensional Accuracy: Laser trackers measure frame alignment (±0.03mm), ensuring modules fit seamlessly on-site—reducing ​steel structure building​ rework by 25%.

Example: Delivered a 3000tons​steelwork construction​ project for an milling parts —weld accuracy of 0.15mm, validated by Lloyd’s Register, enabling 6 months on-site assembly of heavy tooling bays.

Welding Quality & Structural Integrity

 

Quality Assurance Protocol​

​​Standard​​ Protocol​ Compliance​
​Material Certification Sourcing from ISO 9001-certified mills (ArcelorMittal, Nippon Steel). Mill Test Reports (MTRs); alloy verification via spectroscopy.
​Frame Welding​ AWS D1.1/D1.8 standards; 100% visual + NDT (X-ray/UT). Welder qualifications per AWS QC7; defect rejection rate <0.3%.
​Dimensional Accuracy​ CMM machines (0.02mm resolution); laser scanning for large assemblies. Tolerances within ±1mm of design; 99.5% pass rate in client inspections.
​Coatings​ Hot-dip galvanizing (ASTM A123) or powder coating (250μm). Salt spray test (ISO 9227) ≥1500 hours; adhesion test ≥5MPa.
​Certifications​ ISO 9001, CE, ASME BPVC Section IX; OSHA-compliant safety protocols. Annual audits by TÜV/BV; green manufacturing (90% scrap recycling).

 

Last month we have completed a ​prefabricated steel buildings​ project for a 1,000-ton industrial press workshop for hisen in Tailand workshop, 4-week early delivery.

Transportation & Installation Advantage​

Modular Shipping: Disassembled ​prefabricated metal building​ modules (max 15m length) packed in VCI-wrapped crates—protecting frames during transit.

Global Logistics: Partnered with Maersk/COSCO for oversized cargo; SPMT trailers enable door-to-door delivery of ​building metal​ workshops (handling 1,500+ ton shipments).

On-Site Support: Dedicated installation teams use laser levels and hydraulic torque wrenches to align frames—reducing ​steel workshop​ installation time by 50%.